0
We will call you back in 25 seconds
Order a call

Construction dynamics of RC A5: May-October 2023

Construction dynamics of RC A5: May-October 2023
Construction dynamics of RC A5: May-October 2023
Construction dynamics of RC A5: May-October 2023
Construction dynamics of RC A5: May-October 2023
Construction dynamics of RC A5: May-October 2023
Construction dynamics of RC A5: May-October 2023

01 /01

The high pace of construction at blago is the result of the tireless work of the entire team and the constant motivation to change the city for the better. The example of the A5 residential complex demonstrates the speed with which we implement our projects.   The following changes have taken place since May this year:   Sections 1-2 All floors have been completed. The outer walls of the 7th-11th floors have been built. The internal walls of the 6th-8th and 11th floors have been built. Internal walls of the 9th and 10th floors are 25% complete. Glazing of the 3rd-11th floors has been completed. Works on the facade have been completed by 50%. The roof of the commercial building is 90% complete. The sloping screed of the roof of the building has been completed. The drilling and concreting of sheet piles has been completed. Plastering of the floors is in progress.   Section 3 The basement, 1-7th floors have been completed. The construction of the 8th floor is in progress. The outer walls of the 1-2nd residential floors have been constructed. Laying of external walls of the 3rd residential floor is in progress. Laying of the internal walls of the 1st residential floor is in progress.
envelope

Find out first about the company's news