Construction dynamics of the IQ House residential complex: March – July 2023
We have prepared a new report from the construction site for you. It shows how quickly we are turning the project into beautiful, comfortable homes with modern technical solutions.
The photo report shows how all three sections of the IQ House have grown:
Section 1
The 3-4th floors have been built.
The internal walls of the 1st floor have been built.
The outer walls of the 1st and 2nd floors have been built.
Laying of the outer walls of the 3rd floor has begun.
Installation of windows on the 1st and 2nd floors is completed.
Completed laying of pipes for domestic sewage, stormwater, water supply and cable products.
Reinforcement of the basement slab has begun.
Section 2
The 7th-9th floors were erected.
Internal walls of the 3rd-6th floors have been constructed.
Exterior walls of the 4th-6th floors have been constructed.
Laying of the outer walls of the 7th floor has begun.
Installation of windows from the 1st to the 5th floor is completed.
Installation of pipes for domestic sewage, stormwater, water supply and cable products has been completed.
Reinforcement of the basement slab has begun.
Section 3
The 6th and 7th floors were erected.
Exterior walls of the 1st-4th floors have been constructed.
Laying of the exterior walls of the 5th floor is in progress.
The internal walls of the 1st-4th floors are being built.
Installation of windows from the 1st to the 4th floor is completed.
Find out first about the company's news