Construction state of the residential complex “U ONE” as of 13.03.2023
Section 3
Installation of the floor slab of the 5th floor is completed.
Installation of vertical elements of the 6th floor is in progress.
Laying of the outer walls of the 2nd floor is completed.
The laying of the outer walls of the 3rd floor and the inner walls of the 2nd floor is in progress.
Section 4
Installation of vertical elements of the 2nd floor continues.
Installation of the floor slab of the 1st floor is completed.
Section 2
Installation of monolithic grillage and vertical elements of the 1st floor is in progress.
Section 1
Reinforced concrete piles have been pressed by 60%.