0
We will call you back in 25 seconds
Order a call

Construction status of the residential complex “Avtorskyi” as of 10.07.2023

Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023
Construction status of the residential complex “Avtorskyi” as of 10.07.2023

01 /01

Sections 1-2 Works are underway to improve the adjacent territory. The industrial floor of the parking lot is 80% complete. The waterproofing of the parking lot floor slab is 80% complete. Installation of staircase railings in section 2 is completed. Works on parking lot lighting are in progress. Sections 3-4 Finishing of corridors in section 3 is completed. Works on waterproofing of the parking lot floor slab are in progress. Works on the arrangement of internal communications of the parking lot in sections 3-4 are in progress. Installation of elevators in sections 3-4 is completed. The installation of terrace boards on the terraces of penthouses in sections 3-4 has been completed. Works on finishing balconies with ceramic tiles in section 3 are completed. Works on finishing balconies with ceramic tiles in section 4 have begun. Works on the improvement of the adjacent territory of the residential complex are ongoing.
envelope