Section 1
Completing the excavation of the pit. Section 2
Installation of the floor slab of the 2nd floor is completed.
Concreting of the floor slab of the 3rd floor is completed.
Section 3
Installation of the floor slab of the 1st floor is completed.
The construction of vertical elements of the 1st floor is completed.