Construction state of the Manhattan UP residential area as of 06.24.2022
Section A1
Installation of the floor slab of the 8th floor has begun.
Completion of the exterior walls of the 4th floor.
The laying of the internal walls of the 3rd floor continues.
Installation of the floor slab of the 4th floor has begun.
Earthworks on the construction of the pit are completed.
Work has begun on the installation of the foundation slab. 1Like this17:05